|
PROPOSED CIP 2010-2015
Capital Improvements Program and Other Capital Improvements 2010-2015.
A six-year Capital Improvements Program is developed and updated annually. The following pages contain the City of Lebanon's 2010-2015 CIP. The cost of individual projects are based on the best estimates available at the time this plan was prepared; actual project costs are a function of detailed study by architects and engineers.
2010-2015 CAPITAL IMPROVEMENTS PROGRAM .1 Summary .2 Summary .3 Summary .4 Summary .5 Summary
2010-2015 CAPITAL IMPROVEMENTS PROGRAM Summary Projects Projects by Type Project Financing Estimated Tax Rate Debt Financed Existing Funds Financed
2010-2015 CIP PROJECT PROPOSALS Terminal & Maintenance Areas Study Hillcrest Acres Infrastructure Airport Terminal Improvements Airport Business Park Phase 1B Infrastructure Lower Meadows Park Complex Mascoma Greenway
2010-2015 CAPITAL IMPROVEMENTS PROGRAM Summary Projects Projects by Type Project Financing Estimated Tax Rate Debt Financed Existing Funds Financed
2010-2015 CIP PROJECT PROPOSALS Combined Sewer Overflow and Utility Replacement Fleet and Equipment Replacement Streets Rehabilitation and Reconstruction Hanover Street Sewer Replacement Water Main Improvements Exit 20 Water Main Improvements South main Street Dry Bridge#062-117
LFD Extrication Equipment Airport Layout Plan Exhibit A Reconciliation Tree Removal Storrs Hill Electrical Upgrade LFD Station NO.1 Renovation Airport Environmental Assessment Phase 2 Landfill Gas Market Analysis and Energy Project Phase 2 LFD Vehicle and Equipment Replacement Water Meter Radio Read Conversion Airport Rehabilitate Obstruction Poles &lights Phase 2 &3 Airport Fuel Truck Spill Containment Area
Airport Runway Safety Area Enhancements Land Acquisition Airport Runway Safety Area Enhancements Wetland Mitigation Design and Construction Airport Runway 36 Removal and Design and Construction Mechanic Street Bridge #120-115 Airport Snow Removal Equipment Building Design & Construction Landfill Phase lIB Partial Closure Landfill Phase 11C Design and Construction Airport Acquisition of Index "B" Airport Rescue and Firefighting Truck Airport Runway Safety Area Enhancements North-South Runway
|